Lorem Services General,Project Highlights Lorem Recent Projects

Lorem Recent Projects

PROJECT

LOCATION

MAJOR CLIENT / COMPANY

STATUS

12.25” Bit Application Engineering & Optimization

Umuseti 6, Kwale, Delta State

Pillar Oil Comapany

Completed

750m Horizontal Directional Drilling

Yenagoa,

Bayelsa, NIGERIA

SHELL- DAEWOO

Completed

Geotechnical Investigations

Grand Cache,

AB, CANADA

PEYTO EXPLORATION INC.

Completed

950m Horizontal Directional Drilling

Buckinghorse River, BC, CANADA

ProEX ENERGY

Completed

650m Horizontal Directional Drilling

(2 wells)

Trutch Creek, Buckinghorse. BC. CANADA

ALBERTA CLIPPERS ENERGY

Completed

1500m Horizontal Directional Drilling (3 wells)

Tumbler Ridge. BC. CANADA

SHELL- FLINT ENERGY

Completed

800m Horizontal Directional Drilling

Wapiti River, AB. CANADA

SHELL -CONOCOPHILLIPS

Completed

 
20091008002
HDD 22 inchCasing Installation
Onsite Alternate Mud Unit Configuration
Onsite Alternate Mud Unit Configuration
Onsite Alternate Mud Unit Configuration
Lorem CEO - Chief Consultant and Project Directional Driller on-site
Ballasting, Floatation and Installation introduced by Lorem consultants
Ballasting, Floatation and Installation introduced by Lorem consultants
HDD 22 inchCasing Installation
HDD 22 inchCasing Installation
HDD 22 inchCasing Installation
HDD in progress
1000 HP Rig Reconfiguration
previous arrow
next arrow
 
Shadow

Related Post

HDDHDD

Horizontal Directional Drilling Consultancy Services LOREM SERVICES INC and its affiliates have outstanding international experience in planning and execution of HDD projects. We have successfully demonstrated this as consultant inspectors